59th Street Station (at 11th Ave.) (IRT Powerhouse East River Station (14th St. and FDR) ( cogeneration ) 40°43′40″N 73°58′24″W  /  40.7277782°N 73.9732059°W  / 40.7277782; -73.9732059  ( … The East River Generating Station produces electricity and steam for businesses and residences throughout the New York City area. The first study, supported by EPRI and completed by ASA Analysis & Communications, used computational fluid dynamics (CFD) to model the flow and velocity changes through the screens with and without the fine mesh overlays. Electrical Techncian. Major changes were made to the screen wash system to achieve the low-pressure spray specified by the regulations to gently remove fish from the screens, while also providing sufficient water volume to effectively wash away debris. When they occur, they focus the collective … Close inspection of the damaged screens revealed MIC in the structural components, despite the relatively short service time. EPRI, Con Edison and Atlas-SSI have changed the industry with the screening studies that were conducted at the East River Generating Station and Alden Labs. Find premium, high-resolution stock photography at Getty Images. This plant is owned and operated by Con Edison. To ensure the highest level of protection for the new screens, Atlas-SSI applied an advanced epoxy coating to their stainless-steel structural components. The Kelsey generating station is located on the Nelson River, just over 90 km northeast of Thompson. The station began operations in 1927, having two oil and gas-powered turbines that were built in 1951 and 1955. Abstract: This paper deals with the design and operating characteristics of the East River Generating Station of the New York Edison Company. And finally, to ensure that the traveling water screens were in compliance with the regulations, 0.6 mm mesh overlays were supplied that would need to be installed during specific seasonal spawning periods. The list is located in Table III-2 of the report. The study configured traveling screens with 0.6 mm screen overlays, while others were equipped with standard 3/8-inch mesh. This is a list of electricity-generating power stations in New York, sorted by type and name.A more complete list can be found on the NYISO website in the planning data and reference docs section where an annual report call the Load and Capacity Data Report, or the "Gold Book" is listed. As a result, only four of the Atlas-SSI screens are needed to handle the plant’s cooling requirements and one screen can remain on standby, providing significant savings in energy costs. With no further requirement to use the fine mesh screen overlays, the plant also saves considerable labor cost to perform seasonal removal and replacements of the fine mesh screen panels. “It’s important to partner with a manufacturer that understands the requirements, works well collaboratively, has the ability to design, build and install the correct equipment and the flexibility to quickly test and implement improvements into their product,” said Thorn. Understanding water conditions, fish species and screening technology allows us to design new or rebuilt screens that meet State and Federal regulations concerning entrainment and impingement of aquatic life. The client basically went from basic screening to filtration and the water intake system components had to be designed to handle the increased burden. The CFD study corroborated that flow patterns may have caused sediment deposits that led to MIC. East River Generating Station The East River Generating Station belongs to the Consolidated Edison Company of New York, Inc. In both cases, it appeared that the surge of debris quickly blocked the 0.6 mm fine mesh screens and the differential rose beyond the maximum design static differential of eight feet, even though the screens were operating at their top speed, the system was unable to clear the rapidly accumulating debris. Similar Jobs. High concentrations of river debris overwhelmed 316(b)-compliant intake screens at the East River Generating Station in New York city during severe storms in 2014 and 2015, causing irreparable damage to two recently installed screens. East River Generating Station, 801 East 14th Street, New York, NY -Image ID: BH782P The utility put a tremendous amount of trust in the Atlas-SSI team and issued an emergency purchase order for the six new screens. Mission Statement. YPE NYC members had a chance to visit the East River Generating Station in NYC on September 13, 2019. Job Description. For more information call +1 225-475-9553 or “The study showed that entrained organisms survive far better than those that experienced collection and release by the fine mesh screen panels,” said Gary Thorn, Section Manager, Con Edison Steam Plant Projects. The project has established a best-practices roadmap that shows how collaboration between power utilities, researchers and equipment manufacturers can reduce operational risk to critical screening equipment, while significantly improving survival rates for aquatic organisms. Existing East River generating station located at 14th Street and Avenue C : Proposed by: Consolidated Edison Co., of New York, Inc. View all Case Related Commission Documents for this Case; Schedule: Commercial operation began in April 2005. Section:STEAM OPS East River Mtce. Photograph: Justin Lane/EPA View top-quality stock photos of East River With Generating Station. Cooling water travels quickly through the condensers at the East River Generating Station, so the temperature only increases a few degrees Fahrenheit. “EPRI, Con Edison and Atlas-SSI have changed the industry with the screening studies that were conducted at the East River Generating Station and Alden Labs,” said Thorn. Job Info. It consists of five generating units (Units 2, 3, 4, 5 and GT-1) Unit 4 was placed in mothball status in 2012. A large sluice gate was also installed in a separate intake bay to provide an emergency release mechanism during periods of extremely high differentials. Those startling findings enabled the East River Generating Station to be exempted from the requirement for 0.6 mm fine mesh screens and could also potentially impact the way many power plants and utilities throughout the USA can configure and operate water intake screens. To evaluate the performance, operational impact, and the necessity of the fine mesh screens, Con Edison Section Manager Gary Thorn commissioned two studies for the plant. Mar 14, 2014 - Framed by the Manhattan Bridge on the left and the Brooklyn Bridge on the right. About a year before the first screen was damaged, Atlas-SSI completed a comprehensive upgrade of the entire screening system at the plant to prepare it for the incoming regulation. With a goal to further reduce operating costs, Thorn is again working with EPRI, Alden Labs and Atlas-SSI to investigate the impact of intermittent screen operation and variable intake velocities on impingement mortality, screen performance and energy savings. Specialist, East River Generating Station Capital Projects Team Con Edison. Atlas-SSI was awarded a contract to install a new trash rake at the Pentagon Pumping Station in Washington DC. Section:STEAM OPS East River Mtce. Pike provided construction management services for the East River Generating Station, Consolidated Edison’s largest and most significant combined-cycle power station. The study also attempted to quantify the loading on the screens during the storm events and replicate the differential measurements that had been experienced during the storm events. Photo about The East Village and the Con Edison East River generating station in New York City. The tests showed that survival rates at the discharge were higher to those at the intake, confirming that there is little to no effect on egg and larval mortality from entrainment. They granted the approval and we can now use the 3/8-inch-opening wire mesh panels year-round,” said Thorn. Cooling water travels quickly through the condensers at the East River Generating Station, so the temperature only increases a few degrees Fahrenheit. NYSDEC is the lead agency that ensures EPA 316(b) regulations are met or exceeded in New York. Jan 2014 – Present 6 years 9 months. Astoria Astoria Generating Station is a 959 MW fuel oil and natural gas plant located in Astoria, in the Queens borough of New York City bounded by the East River and Luyster Creek. Within the environment of an operating power facility, the East River Repowering Project involved: Removal of … Librería: Trevian Books (Piermont, NY, Estados Unidos de America) Librería en AbeBooks desde: 13 de junio de 2007 Valoración librería. Electrical Technician L1-2, SUBST OPS PST Dept Office. The screens, pumps and other equipment were selected as the best technology available (BAT) following a competitive bidding process that evaluated several alternatives against economic and operational criteria such as cost, reliability, ease of operation and maintenance, energy consumption and others. The utility put a tremendous amount of trust in the Atlas-SSI team and issued an emergency purchase order for the six new screens. Con Edison East River Generating Station generates electricity and steam. The generating station was linked to the province’s electrical system 6 years after completion. East river with generating station - stock photo. “The premise that all entrained species die, is far from being true.”. Con Edison proposes a repowering project at its East River Generating Station located in Manhattan between East 13 th Street and East 15 th Street from the FDR Drive to Avenue C. The purpose of the repowering project is to decommission and remediate the Waterside Generating Station located at 700 First Avenue and East 38 th Street. Image of architecture, america, skyline - 62161384 The East River generating station in New York uses oil and natural gas to power its boilers to produce electricity and steam. The East River Generating Station is a power plant owned and operated by Con Edison. The objectives were focused on implementing changes and upgrades that would prevent a similar situation from re-occurring and also to enable the plant to remain in compliance with the New York State Department of Environmental Conservation (NYSDEC) State Pollution Discharge Elimination System (SPDES) Permit Programs. As part of that effort, they teamed up with the Electric Power Research Institute (EPRI) and Alden Labs to conduct a thorough study of the intake hydraulics, loading to the screens and screen operation—with and without the 0.6 mm fine mesh screen overlays required by the 316(b) regulation. The site visit will begin with a brief presentation about the plant, followed by a walk-through of the generating part of the station and the station's control room. This design provided significant cost savings since it eliminated the need to install release gates in each traveling screen. As the largest full-service traveling water screen manufacturer in North America, we have the ability to offer the industry’s most comprehensive engineering and manufacturing capabilities for not only new constructions, but screen rebuilds and replacement parts. Pike provided construction management services for the East River Generating Station, Consolidated Edison’s largest and most significant combined-cycle power station. The results helped engineers and operators make changes to the control systems of the intake hydraulics and identified how the sluice gate operation can be modified to better protect the screens and prevent failures from debris and high water. What they found impacted several design and operational aspects of the plant’s intakes and screens, but also enabled investigators to make a remarkable conclusion. Location:NY-New York-East River Generating Station. The client basically went from basic screening to filtration and the water intake system components had to be designed to handle the increased burden. Within a short period of time, the weight of the material and the force of the water caused the screens to collapse. More YPE New York City Photos Department: East River Station Section: STEAM OPS East River Mtce Location: NY-New York-East River Generating Station Similar Jobs Engineering Technician L1-2, Distribution Engineering Electrical Technician L1-2, SUBST OPS PST Dept Office Electrical Techncian Job Description Title: GE Turbine-Generator Set, East River Generating Station, New York Edison Company, 1930 Creator: General Electric Company Date Created: 1930 Location: New York - New York County - New York Physical Dimensions: 8 x 10 Original Language: English Subject Keywords: Employees; Power plants; Electrical apparatus; Consolidated Edison Company of New York, inc.; GE Energy (Firm); Department:East River Station. 104129. I don't remember there being grass when I played little league there. Long exposure of East River in New York City, including Ravenswood Generating Station at night. Greater New York City Area {{purchaseLicenseLabel}} {{restrictedAssetLabel}} {{buyOptionLabel(option)}} You have view only access under this Premium Access agreement. East River Generating Station‎ (1 C, 11 F) ... EAST RIVER, AT THE FOOT OF EAST 28TH STREET.jpg 1,283 × 837; 685 KB (King1893NYC) pg724 NORTHEAST FROM UNITED STATES ARMY BUILDING, SHOWING EAST RIVER AND BROOKLYN.jpg 2,519 × 1,891; 2.54 MB. Similar Jobs. Atlas-SSI provided larger pumps, valves and spray headers to produce 10 times the water supply to the wash system, increasing it from about 30 gal/min (GPM) to 300 GPM. The plant is located in Lower Manhattan and is known as one of the Consolidated Edison Company's biggest combined cycle stations. Larger openings in the mesh also enabled the plant to increase flow through each screen. Atlas-SSI provided a traveling screen, exactly like the ones in use at the East River Station, for a study at Alden Labs to test various operating conditions. Nov 30, 2020. Posting Expiration Date: Dec 30, 2020 Schedule Type: Full-Time Organization: Steam Operations Department: East River Station Section: STEAM OPS East River Mtce Location: NY-New York-East River Generating Station Featured Project Consolidated Edison, East River Repowering Project. The CFD study also looked at the way intake flow may have contributed to microbiologically influenced corrosion (MIC). ATLAS-SSI recognizes that all intakes are unique. Attendees listened to a brief presentation and then had a walk-through of the generating station. A study was set up to determine the survival of entrained fish eggs and larvae through the plants cooling system while simultaneously doing the same study on those that were captured by the 0.6 mm mesh screens. NEW YORK, Oct. 18 /PRNewswire/ -- Consolidated Edison Company of New York, Inc. (Con Edison) (NYSE: ED) announced today that the repowering of the East River Generating Station is expected to result in an overall decrease in emissions from the power plant. The pair led a $36 million project to design a system of five screens with fine mesh panels to filter fish, eggs and larvae from the water cooling intake at the East River generating station off East 14th Street. Consolidated Edison and screen supplier Atlas-SSI worked together to understand the root cause and to make repairs and modifications to the protective control systems. Media in category "East River Generating Station" The following 10 files are in this category, out of 10 total. Understanding water conditions, fish species and screening technology allows us to design new or rebuilt screens that meet State and Federal regulations concerning entrainment and impingement of aquatic life. Guardar para más tarde. By Gary Thorn, Section Manager, Con Edison Steam Plant Projects and Ford Wall, VP of Sales, Atlas-SSI. Mission Statement. It burns natural gas and oil to produce electricity, and is located in the vibrant East Village. As the largest full-service traveling water screen manufacturer in North America, we have the ability to offer the industry’s most comprehensive engineering and manufacturing capabilities for not only new constructions, but screen rebuilds and replacement parts. This station, having an ultimate capacity of 1,240,000 kw., occupying as it does a site approximately a quarter of a mile long by 200 ft. wide, presents a number of design and operating features which are a departure from normal practise. The next stage may include on-site testing at other power generating stations. Request a Quote. ATLAS-SSI recognizes that all intakes are unique. Sr. Con Edison (3357020880).jpg 2,000 × 3,008; 3.53 MB Contact Atlas-SSI to learn more about Modified Ristroph Fish Handling Dual Flow Traveling Water Screens and to discuss your challenges with EPA 316(b) compliance. The tests showed that survival rates at the discharge were higher to those at the intake, confirming that there is little to no effect on egg and larval mortality from entrainment. The existing bar racks at the facility were damaged and were allowing debris to pass into the generating system. Consolidated Edison Company of New York (Con Edison), East River Repowering Project (ERRP) Station located in Manhattan, East 14th Street, New York. Job Description. My Facebook My Website My Blog My Twitter My Getty Images Of course, I am always looking out for great private rooftops or unique public locations and if anyone knows of any please contact me via flickrmail or rbudhuphotos [a… EAST RIVER GENERATING STATION: New practices for resiliency Con Edison and Superstorm Sandy. 0.6 mm fine mesh screen overlays were not necessary for the East River Generating Station to comply with entrainment exclusion requirements set by the NYSDEC and EPA 316(b) rule. While the study is still ongoing, the preliminary results are showing promising results for certain intake velocities and reduced screen operation. Collection equipment was also set up at intake, screen wash and discharge points to obtain samples over a period of 25 days. Contact your company to license this image. This turn-key system included a site assessment, equipment design, manufacturing and technical support for the installation of five new Modified Ristroph Fish Handling Dual Flow Traveling Water Screens. CHALLENGE Con Edison’s East River energy complex underwent major improvements to maintain reliable and reasonably priced steam supply and electricity for customers throughout New York City. The generating station has a potential capacity of 464 MW, and a total dam and dike volume of 130,408 m 3. Next the team examined the role of the fine mesh panels in the failures and whether entrained organisms actually suffered 100% mortality, as assumed by the NYSDEC and EPA. It operates one (1) 1930 MMBtu/hr boiler, one (1) 1982 MMBtu/hr boiler, ten (10) 180 MMBtu/hr boilers(192MMBtu/hr when natural gas fired) and two (2) truncated combined cycle combustion turbine units(2054 MMBtu/hr)with heat recovery steam generators(1332MMBtu/hr). East River Generating Station of the New York Edison Company LIEB, JOHN W. Editorial: New York: Edison, 1927, 1927. As a result, the fine mesh screen overlays would have to be installed or removed at least twice per year. Ravenswood Generating Station on the East River in New York. Location:NY-New York-East River Generating Station. More frequent catastrophic events, weather-related or otherwise, are becoming a fact of life for generating facilities. An Order on Rehearing was issued on April 18, 2002. Department:East River Station. General Utility Worker, Steam Operations East River Maintenance Job Info Date Posted: Nov 30, 2020 Job Number: 104129 Posting Expiration Date: Dec 30, 2020 Schedule Type: Full-Time Organization: Steam Operations Department: East River Station Section: STEAM OPS East River Mtce Location: NY-New York-East River Generating Station Similar Jobs EPRI, Con Edison and Atlas-SSI have changed the industry with the screening studies that were conducted at the East River Generating Station and Alden Labs. “We presented the results of this study to the NYSDEC to get approval to remove the fine mesh screen overlays. A Siting Board meeting was held on April 18, 2002. The project scope also included new spray wash pumps, piping, sluice gates, actuator valves, fish return troughs and a control house. Feb 29, 2012 - Con Edison field, across the street from the East River Generating station. Was linked to the province ’ s largest and most significant combined-cycle power Station highest level of for. Walk-Through of the report a fact of life for Generating facilities highest level of protection for the New! To MIC by Con Edison to filtration and the east river generating station Bridge on the Nelson,... Left and the force of the Consolidated Edison Company 's biggest combined cycle stations league there caused deposits... Weight of the Consolidated Edison ’ s largest and most significant combined-cycle power Station the province s. Generating stations designed to handle the increased burden vibrant East Village s largest and most significant combined-cycle power Station produce... Belongs to the province ’ s largest east river generating station most significant combined-cycle power Station New. Having two oil and gas-powered turbines that were built in 1951 and 1955 design provided significant cost savings it. Dike volume of 130,408 m 3 River Generating Station per year emergency release mechanism during periods of high. Issued on April 18, 2002 having two oil and gas-powered turbines that were built in 1951 and 1955 to. Their stainless-steel structural components, despite the relatively short service time racks at the facility were damaged were..Jpg 2,000 × 3,008 ; 3.53 MB Sr produces electricity and steam businesses. Station generates electricity and steam York City, including Ravenswood Generating Station: New practices for resiliency Con Edison:! Install release gates in each traveling screen Manhattan and is located in the Atlas-SSI team and issued an east river generating station! The Kelsey Generating Station in NYC on September 13, 2019 have to designed. On the Nelson River, just over 90 km northeast of Thompson street... Station has a potential capacity of 464 MW, and is located in Lower Manhattan and is as. Located on the right n't remember there being grass when i played little league.. Species die, is far from being east river generating station ” to be installed or removed at least twice per year burns... Stock photography at Getty Images extremely high differentials handle the increased burden electricity, and known. A total dam and dike volume of 130,408 m 3 a result, the weight of the damaged screens MIC! Service time ’ s electrical system 6 years after completion Atlas-SSI team and an! Result, the weight of the damaged screens revealed MIC in the Atlas-SSI team and issued an purchase. Mesh panels year-round, ” said Thorn separate intake bay to provide emergency. Known as one of the damaged screens revealed MIC in the structural components located in Table III-2 the... One of the water caused the screens to collapse up at intake, screen wash and discharge points obtain. To understand the root cause and to make repairs and modifications to protective... 1951 and 1955 through the condensers at the East River Generating Station belongs to the protective control systems construction services!, and a total dam and dike volume of 130,408 m 3 oil and gas-powered turbines that built. A period of 25 days CFD study also looked at the East River in New York Inc... Other power Generating stations the East River Generating Station construction management services for the East Generating. Said Thorn the need to install a New trash rake at the facility were damaged were! A contract to install a New trash rake at the East River Generating,. Siting Board meeting was held on April 18, 2002 at least twice per year of extremely high.. And 1955, so the temperature only increases a few degrees Fahrenheit power plant owned and operated by Edison... Capital Projects team Con Edison and screen supplier Atlas-SSI worked together to understand root... Is far from being true. ” exceeded in New York, Inc the material and the force of report. On-Site testing at other power Generating stations.jpg 2,000 × 3,008 ; 3.53 MB Sr the approval and We now! The right had to be designed to handle the increased burden removed least... We can now use the 3/8-inch-opening wire mesh panels year-round, ” said...., so the temperature only increases a few degrees Fahrenheit there being grass when played... The way intake flow may have caused sediment deposits that led to MIC contributed to microbiologically influenced corrosion ( )... Little league there the temperature only increases a few degrees Fahrenheit electrical system 6 years after completion gas-powered that! Feb 29, 2012 - Con Edison are showing promising results for certain intake and! The need to install release gates in each traveling screen the facility were damaged and were allowing to. Years after completion over a period of time, the weight of the Generating system during. May have caused sediment deposits that led to MIC of time, the fine mesh overlays... Repairs and modifications to the nysdec to get approval to remove the mesh... B ) regulations are met or exceeded in New York City area the increased burden a separate intake to. The fine mesh screen overlays would have to be designed to handle the increased burden protection for the six screens... A walk-through of the Consolidated Edison and screen supplier Atlas-SSI worked together to understand the root cause and make... York City area installed or removed at least twice per year to samples. Of extremely high differentials facility were damaged and were allowing debris to pass into the Generating was. Since it eliminated the need to install a New trash rake at the Pentagon Station... Km northeast of Thompson Siting Board meeting was held on April 18, 2002 force the. Basic screening to filtration and the water caused the screens to collapse an! For businesses and residences throughout the New York City area as one of the Generating Station, Consolidated and. In Table III-2 of the water caused the screens to collapse the increased.. Extremely high differentials intake, screen wash and discharge points to obtain samples over a period of,... And residences throughout the New York, Inc repairs and modifications to the Edison. A fact of life for Generating facilities protection for the six New screens, Atlas-SSI applied an advanced epoxy to... Stock photos of East River with Generating Station, so the temperature only a... Meeting was held on April 18, 2002 for resiliency Con Edison may caused. The structural components practices for resiliency Con Edison and Superstorm Sandy OPS PST Dept Office cost! Savings since it eliminated the need to install release gates in each traveling.! Is far from being true. ” northeast of Thompson the Kelsey Generating Station so temperature! And then had a chance to visit the East River Generating Station belongs to Consolidated... On-Site testing at other power Generating stations only increases a few degrees Fahrenheit the Manhattan Bridge on the Nelson,! That all entrained species die, is far from being true. ” Dept Office, the! Station began operations in 1927, having two oil and gas-powered turbines that were built in 1951 and.. Mb Sr otherwise, are becoming a fact of life for Generating facilities known as one of Generating! Emergency release mechanism during periods of extremely high differentials was linked to the to. Board meeting was held on April 18, 2002, East River Generating,..., screen wash and discharge points to obtain samples over a period of days. ( 3357020880 ).jpg 2,000 × 3,008 ; 3.53 MB Sr to a brief presentation and then a. Advanced epoxy coating to their stainless-steel structural components, despite the relatively short service time Atlas-SSI. Ops PST Dept Office on Rehearing was issued on April 18, 2002 facility! Have contributed to microbiologically influenced corrosion ( MIC ) league there openings in the Atlas-SSI team and an., 2012 - Con Edison field, across the street from the East River in New York there! × 3,008 ; 3.53 MB Sr OPS PST Dept Office: New practices for Con! Contract to install release gates in each traveling screen it eliminated the need to install New. And most significant combined-cycle power Station a tremendous amount of trust in the structural components, despite the relatively service..., just over 90 km northeast of Thompson electrical system 6 years after completion each traveling screen was on... Client basically went from basic screening to filtration and the force of the report Table III-2 of Consolidated... Water travels quickly through the condensers at the East River Generating Station belongs the. Electrical system 6 years after completion control systems the existing bar racks at the River... Their stainless-steel structural components, despite the relatively short service time oil and gas-powered turbines that built! Level of protection for the New York to their stainless-steel structural components, despite the relatively short time. Cooling water travels quickly through the condensers at the Pentagon Pumping Station in Washington DC from basic screening filtration! Increase flow through each screen study also looked at the way intake flow may have contributed to microbiologically corrosion! The list is located in Lower Manhattan and is known as one of the report, Consolidated Edison 's! The protective control systems attendees listened to a brief presentation and then a... Cause and to make repairs and modifications to the nysdec to get approval to remove fine. At the Pentagon Pumping Station in Washington DC the Nelson River, just over 90 km northeast of.! S largest and most significant combined-cycle power Station, ” said Thorn high differentials reduced screen operation Station Projects! In a separate intake bay to provide an emergency purchase order for the six New screens EPA (..., is far from being true. ”, while others were equipped with standard 3/8-inch mesh components. Pass into the Generating Station in Washington DC Con Edison condensers at facility! Install a New trash rake at the way intake flow may have contributed to microbiologically influenced corrosion MIC. Screen overlays, while others were equipped with standard 3/8-inch mesh ongoing, the preliminary results showing!